Switching lists rebuilt Tasks.Items from scratch but left SelectedTask pointing
at a row from the previous list, so the detail pane kept showing that task even
though it is not in the visible list. Drop the selection when the list actually
changes; a reload of the same list (worker refresh, reconnect) keeps it so a
live update never yanks the detail pane away.