3 Commits
Author SHA1 Message Date
mika kuns f9a8ed761a docs: record the operation-feedback state before the v2.10.0 cut
Changelog / changelog (push) Successful in 2s
Release / release (push) Successful in 43s
Plan checkboxes stood at zero although P0, A, B, C1 and D are all merged --
anyone reading it would have assumed nothing was built. Ticks the merged
packages, records A5's cancellation and the visual pass, and names the two
leftovers (the three unused ops.* keys from A3/A4, C2-C5 as the only open
group). Also corrects the batch_* tool count from eight to seven and puts the
OperationTiming kill-switch note in the Ui CLAUDE.md back into English.
2026-08-17 11:45:03 +02:00
mika kuns eca16a3506 docs(plans): grobe Task-Entwürfe je Gruppe und Test-Kommandos ergänzen 2026-08-11 19:32:41 +02:00
mika kuns 260cb5a89c docs(plans): Vorgaben je Merge-Helper-Gruppe für Operations-Feedback 2026-08-11 19:29:04 +02:00